Bathroom tiling in Kuwait - Abbasiya

Bathroom tiling in Abbasiya

Bathroom tiling in Abbasiya addresses older residential buildings with weak bases and damp walls. We strip old tiles and mold, apply strong waterproofing, then lay new tiles.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abbasiya comprises older residential apartment blocks from the 1960s and 70s, mostly five storeys over ground shops, with sandy bases and thin plaster walls. Old bathrooms are prone to moisture and leaks because the original sealing is minimal or absent. We remove old tiles, mold and damaged plaster first, treat cracks with cement injection, then apply modern waterproofing of sufficient thickness to stop moisture returning.

Abbasiya sits in Farwaniya governorate, a zone of older residential blocks needing bathroom waterproofing upgrades.

Most old apartment bathrooms in Abbasiya lack original waterproofing and need base reinforcement before new tiling.

Back to Bathroom tiling

See also: Ceramic & porcelain tiling in Abbasiya

What the tiling work covers - Bathroom tiling

What the tiling work covers

Substrate preparation, waterproofing, tile fixing, grouting and a bathroom ready to use.

  • Substrate preparation

    Levelling floors and walls and removing loose or uneven surfaces before fixing.

  • Waterproofing layer

    Applying a membrane to floors and wall bases before any tile is set.

  • Tile fixing

    Setting ceramic or porcelain using adhesive suited to wet areas with even coverage.

  • Grouting and joints

    Filling joints with moisture-resistant grout and flexible sealant at corners and junctions.

  • Renovation retiling

    Stripping old tiles and fully retiling bathrooms in villas or apartments.

  • Final finishing

    Cleaning tiles and grout lines and checking levels before handover.

How it works.

  1. Call or whatsApp

    Contact us to describe the bathroom and arrange a site visit.

  2. Site inspection

    Measuring surfaces, assessing substrate condition and waterproofing needs.

  3. Tile selection and quote

    Confirming tile type, layout pattern and submitting the price offer.

  4. Tiling works

    Substrate prep, waterproofing, tile fixing and grouting in sequence.

  5. Check and handover

    Checking levels and grout lines and cleaning before handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom tiling in Abbasiya

Call now
Do you completely remove wet old tiles before new tiling?

Yes, complete removal is essential because old tiles hide mold and seepage underneath. We expose damaged walls, treat them with mold-resistant material, then apply new waterproofing.

Do old damp walls need cement injection before tiling?

Yes, if walls leak from outside or from the base. We inject cracks with water-resistant cement material, then apply thick surface waterproofing before tiling.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works