Tile-over-tile installation in Kuwait - Ardhiya

Tile-over-tile installation in Ardhiya

Installing new tiles over old ones without demolition in Ardhiya is a practical solution for existing homes near the industrial zone. We examine the existing tile bed, prepare the surface precisely, and fix new tiles securely and completely level.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Ardhiya features homes and apartments of varying ages, many built on concrete floors with older tiles. Seasonal moisture and climate changes in the area affect tile adhesion over time, so thorough inspection for gaps and detachment is necessary before fixing. We use high-grade levelling compound to fill variations, the entire surface is cleaned of dust and dampness, and any loose old tiles are secured or replaced before new installation.

Ardhiya is in Farwaniya governorate, a residential district near the industrial zone with homes of mixed ages.

We inspect old tile adhesion and check surface moisture damage before beginning new installation.

Back to Tile-over-tile installation

See also: Ceramic & porcelain tiling in Ardhiya

What the job covers - Tile-over-tile installation

What the job covers

Assessing the existing tile bed, preparing the surface, and fixing new tiles solid and flat.

  • Existing tile check

    Tap-testing the old tiles to locate hollow or loose areas before starting.

  • Surface preparation

    Degreasing and abrading the glazed surface so adhesive bonds reliably.

  • High-bond adhesive

    Applying a flexible adhesive rated for bonding over an existing ceramic layer.

  • Levelling and alignment

    Using tile levelling clips to keep the new surface flat across the field.

  • Expansion joints

    Leaving perimeter gaps and sealing them with flexible filler suited to Kuwait's heat.

  • Grouting and clean-up

    Grouting joints with a humidity-suited type and cleaning the surface before handover.

How it works.

  1. First contact

    Call or WhatsApp us with the area description and location.

  2. Site inspection

    We visit to measure, tap-test tiles, and assess existing layer condition.

  3. Quotation and approval

    We submit a detailed quote covering materials, labour, and any removal zones.

  4. Preparation and fixing

    Surface abraded, adhesive applied, tiles fixed with levelling clips and expansion joints.

  5. Grouting and handover

    Joints grouted, surface cleaned, and area handed over after adhesive cure period.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Tile-over-tile installation in Ardhiya

Call now
Does moisture affect fixing new tiles over old ones?

Yes. We inspect for moisture first and let it dry completely before fixing. Any remaining dampness weakens adhesion and levelling.

What do we do if we find loose or detached old tiles?

We secure it with strong mortar or replace it before new installation. Weak tile under new tiles will cause fixing failure.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works