
Bathroom retiling in Zahraa
Bathroom retiling in Zahraa requires complete removal of old tile, surface preparation, waterproofing, and installation of fresh material. The humid, hot climate demands tiles and adhesives that resist moisture, salt efflorescence, and cracking.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Zahraa is made up of villas and small apartment blocks with bathrooms of varying sizes and layouts, most built in the 1980s and 1990s. Older bathrooms there suffer from water seepage and deep moisture in the concrete, especially around pipes and corners. Removing old tile often uncovers cracked adhesive and weak or missing waterproofing, so we strip to bare concrete, fill cracks and voids, apply strong waterproof membrane, and then set new tile.
Zahraa sits in Hawalli governorate, an older residential neighbourhood of villas and small apartment blocks built in the late twentieth century.
We strip to bare concrete and apply waterproof membrane at uniform thickness before any new tile is set.

What the work covers
Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

Old tile removal
Breaking out old tiles and adhesive bed without damaging the substrate.

Screed levelling
Correcting floor slope toward the drain and levelling walls before tiling.

Junction waterproofing
Applying waterproof membrane at floor edges and wall bases before tiling.

Floor and wall tiling
Laying ceramic, porcelain or marble with precise alignment and level.

Grout and silicone
Filling joints and sealing movement junctions with mould-resistant silicone.

Drain refitting
Refitting the drain cover and trap flush with the finished tile surface.
How it works.
Contact and survey
Call or WhatsApp us to arrange an on-site bathroom survey.
Material selection
We help you choose the tile, format, grout colour and finish.
Strip and prepare
Old tiles removed, substrate levelled and waterproof membrane applied.
Tiling and grouting
New tiles laid, joints grouted and movement junctions sealed with silicone.
Inspection and handover
Slopes, joints and finish checked before we hand the bathroom back clean.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Bathroom retiling
Other services in Zahraa
Questions about Bathroom retiling in Zahraa
Call nowDoes old bathroom tile leave water leaks behind?
Yes, especially in Zahraa where humidity is high and buildings are older. Cracked tile and weak waterproofing let water seep into concrete and neighbouring walls, so we remove all old tile and reapply waterproofing properly.
How many waterproofing layers do new tiles need underneath?
We apply one strong waterproof layer at code-standard thickness, with extra focus on corners, pipes, and openings. New tile is set over this membrane using moisture-resistant adhesive.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps