Bathroom retiling in Kuwait - Salhiya

Bathroom retiling in Salhiya

Bathroom retiling in Salhiya requires removing old cracked tile, preparing the surface for full waterproofing, and laying new tile that resists high humidity and heat. The mixed commercial buildings in Salhiya demand precise waterproofing to protect lower floors from seepage.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Bathrooms in Salhiya's mixed commercial buildings face constant humidity from heavy daily use, and old tile cracks and leaks after years. We remove tile with specialty tools without damaging the concrete surfaces underneath, then clean and level the damp substrates and apply two-coat waterproofing before laying new tile with waterproof mortar. Tight gaps and corners need extra sealing because moisture seeps through them easily.

Salhiya is in Capital governorate, a district of commercial and mixed-use buildings near Salhiya Commercial Complex.

We apply waterproofing standards to all horizontal and vertical surfaces including wall-to-floor junctions.

Back to Bathroom retiling

See also: Bathroom renovation in Salhiya

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Salhiya

Call now
How do you prevent water seeping from the bathroom to the floor below?

We apply two-coat waterproofing on the floor and walls before tiling, with focus on corners and gaps. This stops moisture from seeping through cracks and joints.

Can you lay new tile over old tile?

No, old tile must be fully removed. Old tile hides problems underneath and moisture continues seeping, so new tile will fail quickly.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works