
Bathroom retiling in Daiya
Bathroom retiling in Daiya focuses on stripping away relatively newer layers and moisture-damaged substrates. We choose tile and waterproofing that withstand Kuwait's sharp temperature swings.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Bathrooms in Daiya are mostly in medium-sized villas built in the 1980s and 1990s, with relatively spacious bathroom areas and thick concrete floors. However, Kuwait's high seasonal humidity may have seeped through gaps in old ceramic into the substrate layers, especially around showers and pipes. We carefully strip tile while preserving stairs and corners, then apply high-grade waterproofing before laying new tile to strict hygiene standards.
Daiya sits in Kuwait's Capital governorate, a quiet residential zone near the British School of Kuwait and Daiya Park.
We inspect and clean the thick concrete substrates beneath old tile before applying new waterproofing.

What the work covers
Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

Old tile removal
Breaking out old tiles and adhesive bed without damaging the substrate.

Screed levelling
Correcting floor slope toward the drain and levelling walls before tiling.

Junction waterproofing
Applying waterproof membrane at floor edges and wall bases before tiling.

Floor and wall tiling
Laying ceramic, porcelain or marble with precise alignment and level.

Grout and silicone
Filling joints and sealing movement junctions with mould-resistant silicone.

Drain refitting
Refitting the drain cover and trap flush with the finished tile surface.
How it works.
Contact and survey
Call or WhatsApp us to arrange an on-site bathroom survey.
Material selection
We help you choose the tile, format, grout colour and finish.
Strip and prepare
Old tiles removed, substrate levelled and waterproof membrane applied.
Tiling and grouting
New tiles laid, joints grouted and movement junctions sealed with silicone.
Inspection and handover
Slopes, joints and finish checked before we hand the bathroom back clean.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Bathroom retiling
Other services in Daiya
Questions about Bathroom retiling in Daiya
Call nowDoes new tile withstand Kuwait's high seasonal humidity?
Yes. We use ceramic tile with low absorption and thick waterproofing that prevents moisture seeping to layers below.
Do you reinstall shower and pipes if they need removal during tile stripping?
Yes, we carefully remove shower and pipes, inspect them, and reinstall with tight fittings before laying new tile.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps