Bathroom retiling in Kuwait - Faiha

Bathroom retiling in Faiha

Fresh bathroom tile in Faiha must resist moisture and salts from the area's high groundwater table. We remove old tile, clean the substrate, apply strong waterproofing, and set durable new tile.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Faiha is a quiet suburban area of detached villas on medium plots, many built in the 1970s and 1980s with weaker groundwater drainage standards than today's codes. High groundwater and salts penetrate villa foundations and rise through bathroom walls, leaving salt stains and efflorescence on tile and grout. Removing old tile in these cases reveals walls that need deep salt cleaning before applying strong waterproofing, and we often use dual-layer polymer membranes to ensure lasting protection against rising damp.

Faiha sits in Capital governorate, a quiet villa area surrounded by Faiha Park.

Most Faiha villas suffer rising damp and salt ascent through walls, requiring multi-layer waterproofing.

Back to Bathroom retiling

See also: Bathroom renovation in Faiha

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Faiha

Call now
Will new tile solve the white salt staining on bathroom walls?

Tile alone is not enough. We must clean walls of accumulated salts and apply strong waterproofing beneath the tile to stop new rising damp.

Why does salt reappear after bathroom repair?

If walls are not cleaned of old salt and effective waterproofing is not applied, groundwater continues rising and carries fresh salts behind the new tile.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works