Bathroom retiling in Kuwait - Abdullah Al-Salem

Bathroom retiling in Abdullah Al-Salem

Fresh bathroom tiling in Abdullah Al-Salem requires careful removal of old tile and surface prep, followed by waterproofing before installation. We select materials rated for high humidity and the intense heat typical of Kuwait's climate.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most villas and apartments in Abdullah Al-Salem were built two decades ago, and their bathrooms show cracks and water seepage from thermal expansion and deteriorated old mortar. The substrate under the tile is usually plain concrete or brick, and needs full inspection to detect old leaks before retiling. We remove the tile with specialized tools without damaging the surrounding bathroom walls, then apply waterproofing layers before setting fresh tile with heat-resistant mortar.

Abdullah Al-Salem lies in Kuwait City governorate, a residential district of villas and apartment buildings constructed in the 1990s and early 2000s.

Bathroom waterproofing requires at least one layer of waterproofing membrane before fresh tile installation per Kuwait building code.

Back to Bathroom retiling

See also: Bathroom renovation in Abdullah Al-Salem

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Abdullah Al-Salem

Call now
Does old tile cause water seepage to lower floors?

Yes, if the mortar has cracked or deteriorated. We inspect walls and floor before retiling to detect any seepage, then apply comprehensive waterproofing.

What tile and mortar type suits Kuwait's heat and humidity?

We use high-grade ceramic or porcelain tile with heat-resistant mortar that resists thermal expansion and contraction. This prevents cracks and early failure in Kuwait's hot and humid climate.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works