Bathroom retiling in Kuwait - Yarmouk

Bathroom retiling in Yarmouk

Fresh bathroom tile in Yarmouk lasts in Kuwait's climate when we carefully remove old tile, clean the concrete substrate, apply effective waterproofing, and set new tile. We choose materials suited to resisting moisture and heat.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Yarmouk is a residential area of multi-storey apartment blocks and some villas on regular plots, most buildings constructed four to five decades ago. Bathrooms in these blocks suffer seepage from hidden drain and pipe systems in walls and floors, and water trapped behind old tile causes mortar and concrete deterioration. When removing old tile we often discover advanced moisture conditions requiring surface treatment with anti-mould solutions before fresh waterproofing, and we ensure proper horizontal floor drainage with correct slope to prevent water pooling.

Yarmouk sits in Capital governorate, a residential apartment area beside a well-known sports club.

Most bathrooms in Yarmouk's older apartment blocks need anti-mould treatment before waterproofing.

Back to Bathroom retiling

See also: Bathroom renovation in Yarmouk

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Yarmouk

Call now
Is bathroom moisture always caused by pipe leakage?

Not necessarily. Moisture may come from water vapour buildup with poor ventilation, or slow seepage through foundations. When we remove old tile we identify the moisture source clearly.

What does anti-mould treatment mean before new tile?

We apply antimicrobial solutions that remove fungi and mould from the concrete surface before waterproofing, ensuring mould does not return behind the new tile.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works