Wall-hung basin installation in Kuwait - Anjafa

Wall-hung basin installation in Anjafa

Wall-hung basin installation in Anjafa requires careful assessment of concrete slab walls, especially in residential apartments and villas with multiple bathrooms. We mount the basin on robust metal brackets and connect the supply and drain runs to ensure a leak-free finish from day one.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Anjafa is an older residential district with villas on tight plots and small apartment blocks, most built before 2000. The bathroom walls are either plain concrete slabs or uneven clay brick, and the old drainage pipes often run at incorrect angles. When installing the basin we first check the wall's load capacity, slab depth and existing pipe routes before drilling holes, because any fixing error leads to hidden wall leaks that are hard to repair later.

Anjafa sits in Hawalli governorate, an older residential district of villas and small apartment blocks.

Most bathroom walls in Anjafa are 15 to 20 centimetres thick concrete or clay brick.

Back to Wall-hung basin installation

See also: Sanitary fixture installation in Anjafa

What the installation covers - Wall-hung basin installation

What the installation covers

Wall assessment through basin fixing, supply and drain connection to final handover

  • Wall and pipe check

    Identify wall construction and locate existing supply and drain stubs

  • Basin anchoring

    Drill and set chemical anchors rated for the basin weight and daily load

  • Supply line connection

    Connect braided hoses to wall isolation valves and check operating pressure

  • Trap and drain fitting

    Fit a brass bottle trap with correct fall toward the concealed drain line

  • Silicone sealing

    Apply neutral-cure sanitary silicone along the full basin-to-wall contact line

  • Operational test

    Load-test the fixing, check every joint for leaks and confirm drain flow

How it works.

  1. Call or whatsApp

    Contact us by call or WhatsApp to describe the site and basin type

  2. Site visit

    Technician checks the wall, pipe stubs and measures the correct fixing position

  3. Quotation

    A clear quote issued covering fixing, connections and any tile-breaking required

  4. Installation

    Set anchors, hang the basin, connect supply and drain lines, apply silicone seal

  5. Test and handover

    Pressure-test every joint and confirm drain flow before handing the site over

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wall-hung basin installation in Anjafa

Call now
Is a wall-hung basin safe on an old clay brick wall?

Yes, if the wall is thick and solid. We test the brick strength with a pilot hole first, then use heavy-duty anchors that penetrate both the brick and the concrete slab behind it for a secure fix.

How do you prevent leaks behind the wall-hung basin after fixing?

We seal all fixing holes with waterproof sealant, ensure supply and drain pipes are airtight without gaps, and apply a waterproof coat to the wall behind the basin before final installation.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works