
Washbasin installation in Anjafa
Washbasin installation in Anjafa requires checking the supply line from the meter to the fixture location, then fitting the trap and valves securely and sealing all joints to prevent leaks. We run a water-flow and drainage test before handover.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Anjafa is a residential district with multi-storey buildings and standard-sized apartments. Most units have multiple bathrooms on each floor, with horizontal supply lines running through common walls between units. When installing a new basin or replacing an old one, we check existing pipe locations to avoid rupture, and ensure the drainage slope is at least one per cent toward the main stack.
Anjafa sits in Hawalli governorate, a residential district with older and relatively newer apartment buildings sharing common service runs.
The horizontal bathroom drain line must slope at a minimum of one per cent toward the main stack or vertical riser.

What the work covers
Site check through supply connection, trap fitting, sealing and a running test.

Site assessment
Check existing supply and drain rough-ins before any fixing begins.

Basin fixing
Fix the basin to the wall with chemical anchors at the correct level.

Supply connection
Connect braided supply hoses with an isolation valve on each line.

Trap and drain fitting
Fit brass bottle trap with correct fall into the drain branch line.

Silicone sealing
Apply neutral-cure sanitary silicone around the full basin perimeter.

Running test
Open the supply and confirm flow, drainage and zero leaks throughout.
How it works.
Call or whatsApp
Send a photo of the basin and the intended fixing location for faster assessment.
Site visit
Technician checks supply stubs, drain outlet and wall construction.
Quotation
Detailed cost covering fixing, materials and any breaking work required.
Fixing and connection
Basin anchored, supply and drain connected, silicone bead applied.
Check and handover
Flow, drainage and leak check completed before the basin is handed over.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Washbasin installation
Other services in Anjafa
Questions about Washbasin installation in Anjafa
Call nowHow do we ensure the basin does not leak from underneath the trap?
We inspect the trap completely and all threaded joints before assembly, then seal every joint with appropriate leak-prevention compound for the pipe material, and finally test by running water for one minute.
Can we install a basin where the current supply line is too far away?
Yes, but we need to run a new supply line from the meter or a nearby branch line. We select the correct diameter based on the run length and required pressure, and avoid long horizontal runs without support.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps