Shower installation in Kuwait - Funaitees

Shower installation in Funaitees

Shower installation in Funaitees begins by opening the wall and extending reliable water and drain pipes through the concrete structure. We pressure-test and then run actual water with zero leaks.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees in Mubarak Al-Kabeer governorate has residential buildings and apartments of varied age, from older buildings from the 1970s and 1980s to newer mid-rise buildings from the early 2000s. This mix means some bathrooms may have irregular wall thickness or complex drainage from past alterations. When installing a shower, we inspect walls first to understand their composition and existing pipes, then carefully plan routes to avoid structural changes.

Funaitees lies in Mubarak Al-Kabeer governorate near Fourth Ring Road, a residential area with buildings of multiple ages.

Older buildings in Funaitees may have walls ranging from 20 to 30 cm thickness due to additions and alterations over the years.

Back to Shower installation

See also: Sanitary fixture installation in Funaitees

What the installation covers - Shower installation

What the installation covers

Wall opening and pipe connection through to a full running test at handover

  • Supply line check

    Confirm hot and cold rough-in branches exist and hold working pressure

  • Mixer or head connection

    Connect mixer body or fixed head to branches with rated sealing rings

  • Drain line connection

    Fit floor trap with correct fall toward the main drain line

  • Plate and bracket fixing

    Anchor wall plate and brackets using chemical fixings where the wall requires

  • Silicone sealing

    Seal every wall penetration and trap rim with neutral-cure sanitary silicone

  • Operational test

    Run hot and cold flow, confirm drain speed, check every joint for drips

How it works.

  1. Call or whatsApp

    Tell us the shower type, bathroom location and wall material

  2. Site inspection

    Technician checks hidden pipe route, trap condition and water pressure

  3. Quotation

    You receive a clear scope and price before any work begins

  4. Installation

    Pipes connected, shower fitted, all joints and wall penetrations sealed

  5. Test and handover

    Full run to confirm pressure, drain speed and seal integrity before handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Shower installation in Funaitees

Call now
How do you handle irregular walls in older Funaitees buildings?

We carefully inspect the wall first to map thickness, existing pipes and internal channels, then plan new pipe routes to avoid intersections and weak points. We use metal detectors and scanning tools to prevent errors.

Do past bathroom alterations affect the new installation?

Yes, they may leave irregular drain channels or abandoned pipes. We remove abandoned pipes first and identify current working channels, then install the shower with routes completely separate from past alterations.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works