Sanitary fixture installation in Kuwait - Funaitees

Sanitary fixture installation in Funaitees

Sanitary fixture installation in Funaitees covers small apartments and mixed villas on medium-sized plots. We deliver tight fitting and zero-leak drainage from day one of operation.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees is a mix of small apartments and relatively modern villas with plot sizes ranging from 500 to 1,000 square metres, so main drainage runs are deep and branches may be angled or awkwardly sized. During installation we review the original layout drawings to understand the network's hydraulic behaviour, and any new tap or toilet connection must match the slope of the main branch. Small apartments especially can face sludge buildup if pipe diameters are too narrow, so we use a standard 50 mm minimum.

Funaitees is in Mubarak Al-Kabeer governorate, near Suleibikhat and alongside the old coastal road.

Drainage networks in Funaitees use branch sizes of 50, 75 and 100 mm depending on load, and we measure slope before closure.

Back to Sanitary fixture installation

What we install - Sanitary fixture installation

What we install

We fit every sanitary fixture in bathrooms, kitchens, annexes and outbuildings.

  • Toilets and bidets

    Floor-mounted, western and wall-hung toilets with cistern and flush set.

  • Basins and ablution bowls

    Wall-hung, countertop and ablution basins fitted to correct frame or bracket.

  • Shower cabins and heads

    Freestanding cabins and fixed shower sets with base sealing.

  • Bathtubs and jacuzzis

    Bathtub levelling and jacuzzi water and electrical connection.

  • Taps and mixers

    Single and dual mixer fitting with vibration-damping seating.

  • Bathroom accessories

    Mirror drains, paper holders and wall-anchored shelves installed securely.

How it works.

  1. First contact

    Call or WhatsApp us with fixture types and site location.

  2. Site survey

    Technician visits, measures drain and supply stub-out positions.

  3. Quote and approval

    Itemised quote sent; work date set after your approval.

  4. Installation

    Each fixture fitted, connected and sealed to supply and drain.

  5. Testing and handover

    Every fixture run and checked before final handover to you.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Sanitary fixture installation in Funaitees

Call now
Does a small apartment in Funaitees need different pipe diameters?

Not necessarily, but minimum diameters must not fall below 50 mm to avoid sludge buildup in slow-moving branches.

Why does understanding the original layout matter before installation?

Because the existing network's slope and standard diameter determine how any new point connects. If we do not match the slope and diameter, sludge buildup or reverse flow can occur.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works