First-fix plumbing, new houses in Kuwait - Funaitees

First-fix plumbing, new houses in Funaitees

First-fix plumbing in Funaitees involves running water supply and drainage lines before slabs and partitions are built. The area has apartment blocks and housing projects with varying ground elevations that require precise slope calculations.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees features dense apartment blocks on medium plots, and many new projects have standardized unit sizes that simplify plumbing layouts. The area's varying elevations mean some buildings sit above the main sewer line, requiring lift stations to pump wastewater. We review the topographic plan and distance to the main drainage pit before sizing pipes and setting required slopes.

Funaitees lies in Mubarak Al-Kabeer governorate near an industrial zone, rapidly growing with new residential developments.

We apply a minimum slope of 1 percent on all drain lines to ensure waste and water flow without pooling.

Back to First-fix plumbing, new houses

What the first-fix covers - First-fix plumbing, new houses

What the first-fix covers

Supply and drain lines to every fixture point, set before walls close and floors are finished.

  • First-fix plumbing and electrics

    Coordinating pipe and conduit routes before walls and ceilings are closed.

  • Bathroom first-fix plumbing

    Precise stub-outs for toilet, basin, shower and bidet supply and drain.

  • Kitchen first-fix plumbing

    In-wall supply and drain stubs for sink, dishwasher and fridge supply.

  • First-fix drainage

    uPVC drain runs laid at correct gradients with access cleanouts.

  • Apartment first-fix plumbing

    Full first-fix for multi-unit buildings with individual isolation per apartment.

  • Pressure test and handover

    Supply network held under pressure before walls are plastered and signed off.

How it works.

  1. Call or whatsApp

    Send drawings and current build stage for an initial quote.

  2. Site visit

    Engineer visits, reviews drawings and counts all required outlet points.

  3. Pipe installation

    PPR supply and uPVC drain runs laid with all stub-outs secured.

  4. Pressure test

    Supply network tested under pressure before walls are plastered.

  5. Handover

    Stub-out layout drawing handed over to the finishing team.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about First-fix plumbing, new houses in Funaitees

Call now
Do you handle terrain variation and install lift stations?

Yes, we survey the terrain and main sewer level first. If the building sits above the main sewer, we design a lift station and include all required connections in the plumbing plan.

How do you handle standardized units in new Funaitees projects?

We apply the same plumbing diagram to every identical unit, reducing errors and delays. We standardize fixture locations and pipe runs across all copies before laying any lines.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works