Rooftop annex in Kuwait - Andalus

Rooftop annex in Andalus

Rooftop annexes in Andalus are built on standardized apartment blocks, typically five to six storeys. We calculate the original foundation load and design the annex to preserve overall structural balance.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Andalus buildings are mostly standardized modern apartment blocks on a single shared foundation. These uniform designs make load and setback calculations straightforward, but adding an annex means reviewing the original structural plan and getting municipality approval for the change. We work with a specialist consulting engineer to recalculate load distribution across foundations and columns.

Andalus is in Farwaniya governorate near Fourth Ring Road, an area of standardized residential housing blocks.

Adding an annex to standardized buildings requires amending the original municipality permit before any construction begins.

Back to Rooftop annex

What the work covers - Rooftop annex

What the work covers

Design, structural check, build and full handover handled under one contract.

  • Rooftop annex design

    Approved drawings suited to the existing floor and municipality requirements.

  • Carrying slab check

    Engineering assessment of the existing slab before any work begins.

  • Rooftop structural shell

    Columns, beams and slab poured to the correct structural specification.

  • Slab junction waterproofing

    Full waterproofing seal at the old roof and new annex floor junction.

  • Staircase access

    Internal or external staircase connecting the annex to lower floors.

  • Full finishing

    Tiling, gypsum, aluminium, glass, paint, electrical and plumbing works.

How it works.

  1. Call or whatsApp

    Tell us the property location and annex requirements to begin.

  2. Site visit and check

    We visit, assess the carrying slab and check site access conditions.

  3. Design and permit

    Drawings prepared and municipality permit obtained before work starts.

  4. Construction

    Dowel fixing, column pour, block walls and finishes per approved drawings.

  5. Inspection and handover

    Waterproofing, drainage and electrical verified before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop annex in Andalus

Call now
Does a rooftop annex affect the original building's stability?

If designed based on precise structural calculations, it does not. We inspect foundations and columns and distribute the new load in full balance across each component.

What are the steps to get municipality approval for a rooftop annex?

We submit architectural drawings and an approved engineer's structural report with a permit amendment request. The municipality reviews the files and issues written approval if the design meets setback and load requirements.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works