Rooftop annex in Kuwait - Omariya

Rooftop annex in Omariya

Rooftop annexes in Omariya are added to existing residential buildings without requiring demolition or major foundation work. We verify structural capacity, design the annex, and hand it over complete with all connections.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Omariya's residential blocks are three to five storeys on family-sized plots, with flat roofs typically unused and available for expansion. The concrete slab is usually 15 to 20 cm thick, and when adding an annex we first check for moisture damage or prior cracks. We apply a waterproof layer beneath the new structure, then pour on temporary formwork supported by the existing slab, with adequate expansion gaps.

Omariya sits in Farwaniya governorate, a family residential area set back from major highways.

A rooftop annex of 30 to 50 square metres typically requires 5 to 7 days of reinforcement and pouring before formwork is struck.

Back to Rooftop annex

What the work covers - Rooftop annex

What the work covers

Design, structural check, build and full handover handled under one contract.

  • Rooftop annex design

    Approved drawings suited to the existing floor and municipality requirements.

  • Carrying slab check

    Engineering assessment of the existing slab before any work begins.

  • Rooftop structural shell

    Columns, beams and slab poured to the correct structural specification.

  • Slab junction waterproofing

    Full waterproofing seal at the old roof and new annex floor junction.

  • Staircase access

    Internal or external staircase connecting the annex to lower floors.

  • Full finishing

    Tiling, gypsum, aluminium, glass, paint, electrical and plumbing works.

How it works.

  1. Call or whatsApp

    Tell us the property location and annex requirements to begin.

  2. Site visit and check

    We visit, assess the carrying slab and check site access conditions.

  3. Design and permit

    Drawings prepared and municipality permit obtained before work starts.

  4. Construction

    Dowel fixing, column pour, block walls and finishes per approved drawings.

  5. Inspection and handover

    Waterproofing, drainage and electrical verified before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop annex in Omariya

Call now
Can we build an annex on a roof that has moisture damage or old cracks?

Yes, but existing cracks must be repaired and a waterproof layer applied before pouring the annex. This protects the original slab and prevents water leakage to lower floors.

What is the timeline from site inspection to full handover of the annex?

Site inspection and report take 3 to 5 days, then municipality approval takes 7 to 14 days. Construction and pouring take 4 to 6 weeks, with finishing and handover adding one more week.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works