Two-storey chalet in Kuwait - Yarmouk

Two-storey chalet in Yarmouk

Building a two-storey chalet in Yarmouk combines secure foundations with solid concrete frame and complete finishes. We pour foundations, raise walls, set second floor and roof, then finish all surfaces to handover.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Yarmouk is an established residential zone with regular plots of 600, 900 sq m and mixed-age buildings. Soil is more stable than coastal areas, with standard foundations dropping about 1.5 m. Chalets here face consistent loads without major seismic movement, so we use standard concrete with ordinary reinforcement. We focus on thermal joints in the roof and exterior walls to handle daily temperature swings.

Yarmouk is in the Capital governorate, an organized residential zone with a housing cooperative and sports club near main streets.

Second-floor roof in Yarmouk chalets is poured with 20 cm concrete slab and standard mesh reinforcement, with expansion joints every 3, 4 metres.

Back to Two-storey chalet

See also: Chalet construction in Yarmouk

What the build covers - Two-storey chalet

What the build covers

Foundations through the second-floor roof, covering all structural and finishing stages.

  • Foundations and ground floor

    Excavation, sulphate-resistant concrete footings, and foundation waterproofing.

  • Second-floor structure

    Columns, beams, and concrete slab for the upper floor with coated rebar.

  • Block walls and roof slab

    Dense concrete block walls and a roof slab with thermal and waterproof layers.

  • Interior and exterior finishing

    Tiling, marble, gypsum, paint, and a clad exterior facade.

  • Plumbing and electrical

    Plumbing and electrical runs for both floors including roof water tanks.

  • On-site technical oversight

    A site technician present from pour to handover on both floors.

How it works.

  1. Call or whatsApp

    Tell us the plot location and your basic chalet requirements.

  2. Site visit and assessment

    We visit the site to assess soil, dimensions, and build conditions.

  3. Drawings and permit

    We prepare architectural and structural drawings and file the permit.

  4. Construction

    We build from foundations to the second-floor roof with continuous site oversight.

  5. Finishing and handover

    We complete all interior and exterior finishing then hand over a move-in ready chalet.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Two-storey chalet in Yarmouk

Call now
What reinforcement is needed for the second floor in Yarmouk chalets?

We use standard steel mesh of 12 mm diameter bars spaced 20, 25 cm apart. This is adequate for typical residential loads.

Are there expansion issues in exterior walls from temperature swings?

Yes, so we install expansion joints in exterior walls and roof every 3, 4 metres, filled with flexible materials that accommodate thermal expansion and contraction.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works