Two-storey chalet in Kuwait - NW Sulaibikhat

Two-storey chalet in NW Sulaibikhat

Two-storey chalets in NW Sulaibikhat require deep foundations and coastal moisture protection. We construct concrete frame, walls, second-floor roof with full moisture sealing and finishes.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

NW Sulaibikhat is a coastal residential zone near the sea with plots of 700, 1000 sq m. Soil is damp with high salt content, requiring deep foundations dropping 2, 2.5 m to reach stable layers. Chalet walls here need full moisture sealing on all sides before construction, and the roof needs leak protection. We use salt-resistant and moisture-resistant materials and monitor surface drainage around the base to prevent water pooling.

NW Sulaibikhat is in the Capital governorate, a coastal residential zone near the sea and waterfront gardens.

Foundations in NW Sulaibikhat typically go 2, 2.5 m deep due to high salt and moisture in coastal soil.

Back to Two-storey chalet

See also: Chalet construction in NW Sulaibikhat

What the build covers - Two-storey chalet

What the build covers

Foundations through the second-floor roof, covering all structural and finishing stages.

  • Foundations and ground floor

    Excavation, sulphate-resistant concrete footings, and foundation waterproofing.

  • Second-floor structure

    Columns, beams, and concrete slab for the upper floor with coated rebar.

  • Block walls and roof slab

    Dense concrete block walls and a roof slab with thermal and waterproof layers.

  • Interior and exterior finishing

    Tiling, marble, gypsum, paint, and a clad exterior facade.

  • Plumbing and electrical

    Plumbing and electrical runs for both floors including roof water tanks.

  • On-site technical oversight

    A site technician present from pour to handover on both floors.

How it works.

  1. Call or whatsApp

    Tell us the plot location and your basic chalet requirements.

  2. Site visit and assessment

    We visit the site to assess soil, dimensions, and build conditions.

  3. Drawings and permit

    We prepare architectural and structural drawings and file the permit.

  4. Construction

    We build from foundations to the second-floor roof with continuous site oversight.

  5. Finishing and handover

    We complete all interior and exterior finishing then hand over a move-in ready chalet.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Two-storey chalet in NW Sulaibikhat

Call now
How do you protect foundations from salt and moisture in coastal areas?

We use salt-resistant concrete and apply insulation layers of asphalt or polyethylene around the foundation. We also install surface drainage systems around the building base.

Does the top roof need extra leak protection in coastal areas?

Yes, we apply extra waterproofing layers (bituminous membrane) under final cladding, with sloped water run-off and insulated thermal joints.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works