Cement-board annex in Kuwait - Siddiq

Cement-board annex in Siddiq

Cement-board annexes in Siddiq go on existing foundations of medium-sized residential homes and older four- to six-storey apartment blocks. We frame, wall and ceiling the space with cement-board panels and finish with tile or paint to your specification.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Siddiq is primarily residential, with villas having front gardens and older apartment blocks on solid concrete foundations. Cement-board annexes are requested by villa owners who need an extra room or office on the ground floor, or by apartment dwellers adding a maid's room on the roof. Existing foundations easily handle the light weight of board and finishes, but we inspect structural condition first and get municipality approval for any roof-level addition.

Siddiq is in Hawalli governorate, a dense residential zone with family villas and apartment blocks served by local schools and shops.

Most annexes on existing foundations need no reinforcement if cement-board and finishes stay under half a tonne per square metre.

Back to Cement-board annex

What the annex covers - Cement-board annex

What the annex covers

Cement-board rooms handled from frame and panels through to finished interior

  • Cement-board rooms

    Enclosed rooms clad in cement-board panels on a cold-steel frame

  • Cold-steel framing

    Galvanised steel sections forming the load-bearing skeleton for panels

  • Thermal insulation

    Insulation layer inside the wall cavity to reduce interior heat gain

  • Joint and edge sealing

    Sealant applied to all panel joints to block moisture entry

  • Interior finishing

    Tiling or interior paint applied to suit the room's intended use

  • Electrical and AC works

    Conduit runs and AC sleeves installed before panels are closed up

How it works.

  1. First contact

    Call or WhatsApp to describe the required room and its location

  2. Site visit and measurement

    We visit to measure the space and inspect the carrying slab

  3. Quotation and sign-off

    A detailed quote covering materials and finish is submitted then signed

  4. Construction

    Steel frame, panels, insulation, electrical and interior finish in sequence

  5. Handover and check

    Joints and finish are checked before handing the room over for use

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board annex in Siddiq

Call now
Can a cement-board annex be built on a roof of an older apartment block?

Yes, provided the concrete ceiling is inspected and municipality and owner approval is obtained. Cement-board is lightweight and won't overburden the slab, and we plan drainage and ventilation properly from the frame stage.

What is the typical schedule for a cement-board annex in a 15-square-metre room?

One to two weeks once the foundation is ready. That includes framing, walls, ceilings and initial finish, and we wait for substrate drying before pouring or fastening.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works