
Demolition & rebuild in Siddiq
Demolition and rebuild in Siddiq targets older two to four-storey apartment buildings on medium-sized plots. We fully remove the concrete frame and foundations, then prepare the site for a new structure meeting current code and approved setbacks.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Siddiq plots run 25 to 35 metres deep and hold older residential buildings with thick concrete walls and strip foundations. Demolition requires first disconnecting the old services from the public network, then breaking the frame with heavy machinery while maintaining safety distances from neighbouring structures. Once the site is levelled, we conduct soil testing and carry out the necessary preparations for the new project's foundations.
Siddiq is in Hawalli governorate, a dense residential district of older buildings near Siddiq Co-op.
Strip foundations in Siddiq typically run 1.5 to 2 metres below natural ground level.

What we demolish
Every structure type, from single villas to multi-storey buildings, cleared to the slab.

Building demolition
Full structural takedown of commercial or mixed-use buildings, rubble removed.

Apartment building demolition
Multi-storey residential frame broken down floor by floor, site cleared.

Old house demolition
Villa or older house torn down including interior slabs and columns.

Partial demolition
Removing a specific wing, floor or wall while the rest stands.

Underground tank removal
Breaking out and removing old septic tanks, water tanks and pits.

Rubble clearance and leveling
Sorting, loading and disposing of concrete debris, then grading the plot.
How it works.
Call or whatsApp
Describe the structure type, location, and planned start date.
Site inspection
Engineer visits to map the structure, utilities, and access constraints.
Permit and disconnections
Owner secures demolition permit; utilities formally cut before work starts.
Demolition works
Structure broken top-down, rubble sorted, loaded and removed daily.
Site handover
Cleared, leveled plot handed over with underground elements fully removed.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Demolition & rebuild
Other services in Siddiq
Questions about Demolition & rebuild in Siddiq
Call nowHow long does demolition of an older apartment building take on a Siddiq plot?
It depends on floor count and plot size. A three-storey building on a medium plot typically takes three to five weeks for full demolition and site levelling.
Do you handle disconnecting old services before demolition?
Yes, we coordinate with Hawalli municipality and public utilities to cut water, electricity and drainage from the network before demolition starts.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps