
Cement-board annex in Mishref
Cement-board annexes in Mishref are built on medium-sized residential plots around the cooperative district. We erect the light frame and panels, then complete all interior finishing from start to finish.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Mishref plots have a comfortable medium size allowing detached annexes without congestion, and most feature older existing buildings with requests for extra rooms. Cement board is lightweight, fitting quickly over existing foundations or current concrete floors, and separation from the main structure uses an expansion joint to maintain minor movement freedom. The panels resist moisture if we select treated board, which matters in the humid Gulf climate.
Mishref lies in Hawalli governorate near the cooperative and Kuwait University, where medium-sized residential plots sit with existing buildings.
A cement-board annex is installed at a depth of three to five metres and a single-storey height maximum without deep foundations required.

What the annex covers
Cement-board rooms handled from frame and panels through to finished interior

Cement-board rooms
Enclosed rooms clad in cement-board panels on a cold-steel frame

Cold-steel framing
Galvanised steel sections forming the load-bearing skeleton for panels

Thermal insulation
Insulation layer inside the wall cavity to reduce interior heat gain

Joint and edge sealing
Sealant applied to all panel joints to block moisture entry

Interior finishing
Tiling or interior paint applied to suit the room's intended use

Electrical and AC works
Conduit runs and AC sleeves installed before panels are closed up
How it works.
First contact
Call or WhatsApp to describe the required room and its location
Site visit and measurement
We visit to measure the space and inspect the carrying slab
Quotation and sign-off
A detailed quote covering materials and finish is submitted then signed
Construction
Steel frame, panels, insulation, electrical and interior finish in sequence
Handover and check
Joints and finish are checked before handing the room over for use
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Cement-board annex
Other services in Mishref
Questions about Cement-board annex in Mishref
Call nowCan a cement-board annex be built on an existing concrete floor?
Yes, we check the floor level and existing drainage, then install a metal base and moisture barriers before attaching the panels. An expansion joint separates the annex from the main building.
How long does it take to finish a cement-board annex from panels to paint?
A single room typically takes two to three weeks from panel and frame installation onward, depending on finishing scope and material lead times.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps