Cement-board annex in Kuwait - Jabriya

Cement-board annex in Jabriya

Cement-board annexes in Jabriya are added to residential villas on medium-sized plots in a quiet neighbourhood. We install the frame and panels while observing boundary lines and setbacks, integrating the annex into the original villa design.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Jabriya villas are typically larger than Salmiya, with plots of 500 to 800 square metres and more horizontal space around the building. Cement-board annexes here are planned living expansions, added to the side or back with safe setbacks from neighbours. The steel frame is lighter and faster to install than traditional construction, so an annex can be completed in roughly two months. We use insulated panels and run electrical and plumbing systems inside the frame before closing the walls.

Jabriya is in Hawalli governorate, a quiet villa district near Mubarak Hospital and Jabriya Co-operative Society.

Jabriya residential plots typically allow for an annex up to 5 to 6 metres deep without exceeding approved municipality setbacks.

Back to Cement-board annex

What the annex covers - Cement-board annex

What the annex covers

Cement-board rooms handled from frame and panels through to finished interior

  • Cement-board rooms

    Enclosed rooms clad in cement-board panels on a cold-steel frame

  • Cold-steel framing

    Galvanised steel sections forming the load-bearing skeleton for panels

  • Thermal insulation

    Insulation layer inside the wall cavity to reduce interior heat gain

  • Joint and edge sealing

    Sealant applied to all panel joints to block moisture entry

  • Interior finishing

    Tiling or interior paint applied to suit the room's intended use

  • Electrical and AC works

    Conduit runs and AC sleeves installed before panels are closed up

How it works.

  1. First contact

    Call or WhatsApp to describe the required room and its location

  2. Site visit and measurement

    We visit to measure the space and inspect the carrying slab

  3. Quotation and sign-off

    A detailed quote covering materials and finish is submitted then signed

  4. Construction

    Steel frame, panels, insulation, electrical and interior finish in sequence

  5. Handover and check

    Joints and finish are checked before handing the room over for use

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Cement-board annex in Jabriya

Call now
How long does it typically take to complete a cement-board annex on a Jabriya villa?

Depending on annex size and weather, it typically takes 6 to 10 weeks from erecting the steel frame through to finishing walls, floors and final painting.

Can electrical and plumbing systems be integrated inside a cement-board annex?

Yes, we run water, drainage and electrical wiring inside the steel frame and in wall cavities before panel installation. This simplifies maintenance and avoids breaking walls later.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works