Two-storey annex in Kuwait - Funaitees

Two-storey annex in Funaitees

A two-storey annex in Funaitees uses medium-sized plots in an organized residential area. We apply municipality setback and height requirements, and coordinate with the site engineer on every structural phase.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees plots are medium-sized and can accommodate two-storey annexes with safe distance from neighbours. Design accounts for nearby houses, so foundations are relatively shallow and carry the lighter frame load. New buildings in the area follow uniform standards, but older plots need assessment of neighbouring foundations before excavation. Water and electrical runs extend from the main house through approved routes, with clearance left around pipes to avoid stress on older foundations.

Funaitees is in Mubarak Al-Kabeer governorate, an organized residential area with medium-sized plots.

The two-storey annex height does not exceed eight metres from ground level per municipality rule for this area.

Back to Two-storey annex

See also: Annex construction in Funaitees

What the work covers - Two-storey annex

What the work covers

Design, permits, structure, finishing, and handover for a two-storey annex

  • Drawings and permits

    Annex drawings prepared and permit file submitted to the municipality

  • Concrete frame

    Reinforced columns, beams, and slabs for both floors

  • Structural tie-in

    Dowel bars drilled and epoxy-fixed into existing columns and beams

  • Walls and insulation

    Block walls built with thermal and waterproof insulation to roof

  • Services rough-in

    Drainage, electrical, and water lines laid before floor screeds

  • Full finishing

    Tiling, gypsum, paint, aluminium, and glazing to handover

How it works.

  1. First contact

    Call or WhatsApp us to describe the villa and available plot area

  2. Site assessment

    We visit to inspect foundations, columns, and municipality setback limits

  3. Design and permits

    Structural and architectural drawings prepared and permit file submitted

  4. Construction and supervision

    Excavation, pour, block work, and finishing under continuous engineering supervision

  5. Handover

    Final inspection and handover with as-built drawings and site documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Two-storey annex in Funaitees

Call now
Does building the annex affect the main house foundation?

If the annex is separate at safe distance, no direct impacts occur. We assess soil and neighbouring foundations before excavation, and leave adequate clearance to avoid additional stress.

What timeframe is needed to complete the two-storey annex to finishing stage?

Delivery depends on annex size, plot location, material and labour availability. We focus on quality at each stage rather than speed, and coordination with the municipality may add time.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works