Two-storey annex in Kuwait - Abu Fatira

Two-storey annex in Abu Fatira

Two-storey annexes in Abu Fatira extend villas on plots with moderate depths while maintaining front and side setbacks. The frame design suits mixed soil conditions and distributed loads on deep foundations to ensure both buildings remain integral.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Abu Fatira plots are moderately sized and relatively spacious, with the villa occupying the front portion and the annex positioned to the rear or side. The soil is a mix of sand and clay, requiring careful excavation and a geotechnical survey before determining foundation depth and the reinforcement needed. We review the construction permit and approved plans, liaise with the municipality on setbacks, and segregate water, drainage and electrical networks for each building from the frame stage onward.

Abu Fatira sits in Mubarak Al-Kabeer governorate, a district of detached villas on plots of moderate depth.

Foundations in Abu Fatira are excavated between two and a half and three metres depending on geotechnical test results for the mixed soil.

Back to Two-storey annex

See also: Annex construction in Abu Fatira

What the work covers - Two-storey annex

What the work covers

Design, permits, structure, finishing, and handover for a two-storey annex

  • Drawings and permits

    Annex drawings prepared and permit file submitted to the municipality

  • Concrete frame

    Reinforced columns, beams, and slabs for both floors

  • Structural tie-in

    Dowel bars drilled and epoxy-fixed into existing columns and beams

  • Walls and insulation

    Block walls built with thermal and waterproof insulation to roof

  • Services rough-in

    Drainage, electrical, and water lines laid before floor screeds

  • Full finishing

    Tiling, gypsum, paint, aluminium, and glazing to handover

How it works.

  1. First contact

    Call or WhatsApp us to describe the villa and available plot area

  2. Site assessment

    We visit to inspect foundations, columns, and municipality setback limits

  3. Design and permits

    Structural and architectural drawings prepared and permit file submitted

  4. Construction and supervision

    Excavation, pour, block work, and finishing under continuous engineering supervision

  5. Handover

    Final inspection and handover with as-built drawings and site documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Two-storey annex in Abu Fatira

Call now
Does the two-storey annex design change if the soil is a sand-and-clay mix?

Yes, we commission a geotechnical survey first to determine layer composition and bearing capacity. Based on that, we select the excavation depth, rebar and concrete mix suited to each layer.

How are the original villa's services kept separate from the new annex?

We install separate meters and routes for water, electricity and drainage for each building from the foundation stage upward. This is done during excavation and reinforcement to avoid any later merging that would require breaking concrete.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works