Annex design in Kuwait - Funaitees

Annex design in Funaitees

Approved annex drawings in Funaitees account for medium-sized plots and the nearby marine environment. We prepare all drawings, studies and approvals needed from initial sketch to building permit.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees plots in Mubarak Al-Kabeer are medium-sized, usually between 600 and 1200 square metres, with relative proximity to the coast and industrial zones. Annexes here are often servant rooms or small storage attached to the main building. Soil contains higher moisture due to nearness to groundwater level, requiring detailed drainage and waterproofing study. Plot boundary distances and local road clearances must be observed in every drawing.

Funaitees is in Mubarak Al-Kabeer governorate near Kuwait's coastal and industrial zones.

We require a soil analysis report to assess groundwater level before approving foundation details.

Back to Annex design

See also: Annex construction in Funaitees

What the design covers - Annex design

What the design covers

We prepare every document you need from the first sketch to permit approval

  • Architectural drawings

    Floor plan, elevations, and sections dimensioned to your plot

  • Structural calculations

    Load verification and design of columns, beams, and footings

  • Tie-in detailing

    Dowel and joint details between new annex and existing frame

  • Permit drawing set

    File formatted to municipality requirements for direct submission

  • Facade design

    Exterior treatment that visually connects annex to existing villa

  • Design supervision

    Site follow-up to confirm drawings are executed correctly

How it works.

  1. Initial call

    Call or WhatsApp us to describe the annex size, use, and location

  2. Site visit

    We visit the villa to measure, assess the existing frame, and check plot limits

  3. Drawing preparation

    We prepare architectural, structural, and tie-in drawings for your review

  4. Review and revisions

    We discuss drawings with you and adjust as needed before submission

  5. File handover

    You receive the full permit file and an execution copy for the contractor

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Annex design in Funaitees

Call now
Do Funaitees annexes need special waterproofing?

Yes, due to relatively high groundwater level. We specify waterproofing layers and underground drainage in the drawings to protect foundations and walls from moisture.

What documents does the municipality require for annex approval in Funaitees?

Signed engineering drawings from a licensed engineer, geotechnical report, site plan with dimensions and setbacks, and plot ownership certificate. We prepare all these documents ready for submission.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works