Annex design in Kuwait - Qibla

Annex design in Qibla

Approved annex drawings in Qibla require careful study of setbacks and loads on the existing structure. We prepare complete drawings from floor plans to structural details, with municipality and civil defence approvals ready for immediate construction.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Old residential and mixed commercial buildings in Qibla sit on medium-sized plots, most with buildings on both sides. The annex is added on the roof or to the side, which requires structural assessment of the existing foundations and columns before any detailed drawing goes forward. We calculate the annex's additional loads and confirm material and space compliance with building code before submitting to municipality.

Qibla is in Kuwait Capital governorate, an old commercial and residential district near Gulf Road and Seif Palace.

We verify the existing foundation capacity and additional load calculations before approving annex drawings.

Back to Annex design

See also: Annex construction in Qibla

What the design covers - Annex design

What the design covers

We prepare every document you need from the first sketch to permit approval

  • Architectural drawings

    Floor plan, elevations, and sections dimensioned to your plot

  • Structural calculations

    Load verification and design of columns, beams, and footings

  • Tie-in detailing

    Dowel and joint details between new annex and existing frame

  • Permit drawing set

    File formatted to municipality requirements for direct submission

  • Facade design

    Exterior treatment that visually connects annex to existing villa

  • Design supervision

    Site follow-up to confirm drawings are executed correctly

How it works.

  1. Initial call

    Call or WhatsApp us to describe the annex size, use, and location

  2. Site visit

    We visit the villa to measure, assess the existing frame, and check plot limits

  3. Drawing preparation

    We prepare architectural, structural, and tie-in drawings for your review

  4. Review and revisions

    We discuss drawings with you and adjust as needed before submission

  5. File handover

    You receive the full permit file and an execution copy for the contractor

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Annex design in Qibla

Call now
How do you ensure the old foundations can bear the annex weight?

We request basic data on the original building and perform structural calculations for added loads. If foundations are insufficient, we specify required reinforcements in the drawings.

Do the drawings include civil defence and municipality approvals?

Yes, we prepare drawings to each authority's specifications and track approvals to completion. The final set includes municipality and civil defence seals.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works