Annex design in Kuwait - Salhiya

Annex design in Salhiya

Approved annex drawings in Salhiya must account for old residential plot constraints and strict setbacks near the commercial zone. We prepare complete technical drawings and coordinate with the municipality to ensure compliance with building codes before handing over designs ready for construction.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Salhiya contains residential plots divided between older buildings of varied styles and gradual newer development, so an annex often attaches to an existing building with limited height and narrow side spaces. The design must respect the municipality-approved setbacks and the mandatory neighbour separation, and some plots impose a ceiling on annex area or height. We survey the actual property boundaries and site, then prepare scaled drawings showing the site plan, elevations, vertical sections and floor layouts.

Salhiya lies in Capital governorate near the Commercial Complex and renowned hotel, where residential plots and the commercial zone sit in close proximity.

Municipality regulations require a minimum 1.5 metre setback between the new annex and the side property boundary.

Back to Annex design

See also: Annex construction in Salhiya

What the design covers - Annex design

What the design covers

We prepare every document you need from the first sketch to permit approval

  • Architectural drawings

    Floor plan, elevations, and sections dimensioned to your plot

  • Structural calculations

    Load verification and design of columns, beams, and footings

  • Tie-in detailing

    Dowel and joint details between new annex and existing frame

  • Permit drawing set

    File formatted to municipality requirements for direct submission

  • Facade design

    Exterior treatment that visually connects annex to existing villa

  • Design supervision

    Site follow-up to confirm drawings are executed correctly

How it works.

  1. Initial call

    Call or WhatsApp us to describe the annex size, use, and location

  2. Site visit

    We visit the villa to measure, assess the existing frame, and check plot limits

  3. Drawing preparation

    We prepare architectural, structural, and tie-in drawings for your review

  4. Review and revisions

    We discuss drawings with you and adjust as needed before submission

  5. File handover

    You receive the full permit file and an execution copy for the contractor

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Annex design in Salhiya

Call now
How do we ensure the annex design fits the old plot's constraints?

We obtain the property deed and the original municipality plot plan, study the current setbacks and the main building's height, then design the annex so it stays within approved setback limits and does not encroach on neighbouring buildings.

Does the approved drawing include room dimensions and location of utilities?

Yes, the drawing includes all interior and exterior dimensions, window and door openings, and routing lines for water, electrical and sanitary drainage according to municipality standard specifications.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works