Third-floor addition in Anjafa
Adding a third floor in Anjafa requires checking the structure below first, since most residential villas there were built on frames not originally designed for extra storeys. We conduct a full structural assessment, reinforce weak points, then pour the third floor with municipality approval.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Anjafa villas were mostly built decades ago on foundations and columns designed for two storeys only, and the sandy soil beneath has natural settlement rates. When adding a third storey, we must verify that the existing foundations, columns and beams can carry the extra load without cracking or uneven settlement. We take soil samples on site, calculate total loads, and issue an approved engineering report before any pouring begins.
Anjafa lies in Hawalli governorate, a district of older residential villas on medium-sized plots with concrete structures from the foundation up.
Most Anjafa villas do not exceed 7 metres in height at the second storey, allowing a third floor addition under municipality rules.

What the work covers
Structural assessment through finished, permitted handover of the complete third floor.

Structural assessment
Columns, beams and foundations checked before any new load is added.

Drawings and permits
Architectural and structural drawings prepared and permit submitted to the municipality.

Concrete frame
Columns, beams and slab poured with heat-cured concrete to resist cracking.

Block walls
Block walls tied to the new frame with horizontal bond steel at every third course.

Rebar tie-in
Epoxy-anchored dowels core-drilled into existing columns where no starter bars project.

Insulation and finishing
New roof slab insulated and third floor finished to the agreed specification.
How it works.
First contact
Call or WhatsApp us describing the villa and its current floor count.
Structure check
Engineer visits to inspect existing columns, beams and rebar condition.
Design and permit
Architectural and structural drawings prepared and building permit obtained.
Construction
Concrete frame poured and block walls built under continuous engineering supervision.
Finishing and handover
Third floor fully finished and handed over with new roof slab insulated.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Third-floor addition
Other services in Anjafa
Questions about Third-floor addition in Anjafa
Call nowHow do we know the old foundations can support a third storey?
We conduct on-site soil testing, take foundation-depth samples, calculate bearing capacity, and require an approved engineer's report before any additional work starts.
What if cracks appear in the walls during pouring?
Cracks indicate structural weakness or soil inadequacy for the new load. We stop work immediately, reassess with a specialist engineer, and determine whether additional reinforcement is needed.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.