Second-floor addition in Kuwait - Zahraa

Second-floor addition in Zahraa

Adding a second floor to an existing house in Zahraa requires careful assessment of the current structure's load-bearing capacity. We start by calculating the existing columns and foundation capacity, then carry out necessary reinforcement before new construction begins.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Zahraa features single and two-storey villas on medium-sized plots, many built in the 1990s to older design standards. When adding a second floor, we assess whether existing columns and foundations are designed to carry an additional storey, and often reinforce columns by adding rebar or pouring new concrete around the existing foundation. The municipality permit requires an approved consultant to certify the structure's capacity and the safety of the new design before any excavation or pouring occurs.

Zahraa is in Hawalli governorate, a district of relatively older residential villas whose original structures may not have been designed to carry an additional floor.

Most older villas in Zahraa were built with columns of 30 to 40 cm diameter, which may not be sufficient to carry the weight of a full new storey without reinforcement.

Back to Second-floor addition

See also: Additional floor in Zahraa

What the work covers - Second-floor addition

What the work covers

Column capacity check through to finished second-floor handover, every stage handled.

  • Existing structure check

    Column and beam dimensions reviewed and visible rebar condition assessed.

  • Drawings and permits

    Approved architectural and structural drawings prepared, municipality permit obtained.

  • Rebar tie-in to columns

    Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

  • Reinforced concrete frame

    Columns, beams and floor slab poured and water-cured to prevent heat cracking.

  • Block walls and roof slab

    Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

  • Full finishing

    Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.

How it works.

  1. First contact

    Call or WhatsApp us to describe the project and arrange a site visit.

  2. Site inspection

    We visit, measure columns and review existing drawings if available.

  3. Drawings and permit

    Structural and architectural drawings prepared and municipality permit obtained.

  4. Structural construction

    Rebar tied in with epoxy, columns, beams and slab poured with water curing.

  5. Finishing and handover

    Walls, electrical, plumbing and full finishing completed, then formal handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Second-floor addition in Zahraa

Call now
How do we confirm the villa's columns can carry a new second floor?

We engage an approved consultant to calculate loads on the existing structure and assess column and foundation capacity. If insufficient, we reinforce the columns by adding rebar and concrete around the existing foundation.

Must the villa be completely vacated during reinforcement work?

It depends on the scope of reinforcement. Minor strengthening may require partial vacation, but for major work like pouring concrete around foundations, we recommend complete evacuation to ensure safety for residents and workers.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works