Additional floor in Kuwait - Zahraa

Additional floor in Zahraa

Adding a floor in Zahraa starts with precise assessment of the existing frame and calculation of its capacity to safely bear a new storey. We manage the project from structural evaluation through handover of the finished level.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Zahraa is a residential area with a mix of villas and apartment buildings at varying heights, some built in different periods to different building standards. Before adding a new floor, we conduct a thorough inspection of concrete condition, rebar, foundation thickness, and depth. Additional loads from the new storey are calculated precisely and distributed across existing columns and foundations. We may need to install additional columns or strengthen foundations locally, or redesign the load-transfer system. The contractor and consulting engineer work together from the initial stage through municipality approval.

Zahraa sits in Hawalli governorate, a residential area of buildings varying in size and height.

We review the original building file if available, otherwise rely on field inspection and laboratory concrete testing.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Zahraa

Call now
What if the foundations are weak and cannot bear an additional floor?

In that case we propose solutions such as foundation reinforcement with additional excavation and mechanical supports, or designing an independent central column system for the new floor. We choose the most cost-effective and safest option.

Will excavation and pouring work affect neighbouring buildings?

Yes, there may be vibration and dust. We coordinate with neighbours in advance and take protective measures such as screens and position scaffolding away from plot boundaries.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works