
Second-floor addition in Qibla
Adding a second floor to an existing structure in Qibla requires checking column and foundation capacity before any loading. We verify the original engineering data and municipal permit, then build up the new frame to the same standards and complete all finishing for handover.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Older and mid-age Qibla buildings have reinforced concrete columns with cross-sections that differ from modern projects. Before adding a floor, we sample the concrete, measure actual dimensions, and study the original structural drawings to calculate available load. Existing floors may have varying thickness or contain tangled old services, so we plan a safe dismantling and remove obstacles for the new addition. After checks and approvals, we pour the new frame and complete finishes while carrying out minor maintenance on lower floors.
Qibla lies in the Capital governorate, a mixed commercial and residential area near Gulf Road and Seif Palace.
We confirm the capacity of existing foundations and columns before designing the new frame for the second floor.

What the work covers
Column capacity check through to finished second-floor handover, every stage handled.

Existing structure check
Column and beam dimensions reviewed and visible rebar condition assessed.

Drawings and permits
Approved architectural and structural drawings prepared, municipality permit obtained.

Rebar tie-in to columns
Epoxy-anchored dowel bars core-drilled into existing columns for full structural continuity.

Reinforced concrete frame
Columns, beams and floor slab poured and water-cured to prevent heat cracking.

Block walls and roof slab
Block walls built and roof slab cast with thermal insulation against Kuwait's heat.

Full finishing
Electrical, plumbing, marble, tiling, gypsum and paint to a ready-to-occupy standard.
How it works.
First contact
Call or WhatsApp us to describe the project and arrange a site visit.
Site inspection
We visit, measure columns and review existing drawings if available.
Drawings and permit
Structural and architectural drawings prepared and municipality permit obtained.
Structural construction
Rebar tied in with epoxy, columns, beams and slab poured with water curing.
Finishing and handover
Walls, electrical, plumbing and full finishing completed, then formal handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Second-floor addition
Other services in Qibla
Questions about Second-floor addition in Qibla
Call nowHow do you verify that existing foundations can support an added floor?
We test the concrete of the foundations and columns, measure their actual dimensions, then review the original drawings to calculate remaining load capacity. If needed, we reinforce the foundations using approved engineering methods.
Can occupants remain in the building during the addition?
It depends on the building condition and planned work. We review safety, vibration and dust with the site engineer; temporary evacuation of upper floors during pouring may be necessary.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps