
Additional floor in Qibla
Additional-floor work in Qibla targets mid-rise residential and commercial buildings on varied plot sizes near Gulf Road. We thoroughly assess the existing frame, manage permits, then execute reinforcement and pouring in one coordinated sequence.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Qibla buildings range from two-storey villas to residential and mixed-use blocks up to five floors. Plot sizes vary, and older buildings often have slab foundations with variable thickness and columns not designed for extra load. When adding a floor, we partly remove the top slab to inspect columns and beams, run bending tests on steel, and review original drawings if available before design approval.
Qibla lies in the Capital governorate near the Seif district and Seif Palace, a mixed government-commercial area interspersed with residences of varied age.
Raft foundations in Qibla typically measure 60 to 80 centimetres thick and require new soil testing to establish additional load capacity.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Qibla
Questions about Additional floor in Qibla
Call nowHow do we verify that old foundations can carry the extra floor?
We take soil samples from foundation depth, excavate test pits to inspect soil type and density, and conduct on-site load tests. Based on results, the structural engineer calculates whether expected settlement is safe or additional reinforcement is needed.
Are original building drawings necessary for an extra floor?
Yes, if available they greatly simplify the work. If not on hand, we take precise measurements of columns, slabs and heights, and rely on site inspection and testing to characterise the existing frame and design reinforcement.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps