
Rooftop floor addition in Qibla
Rooftop floor addition in Qibla requires careful structural inspection of the existing concrete roof before any new load is placed. We verify slab thickness, load-bearing columns and load distribution, then build the new floor with full drainage and finishing.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Qibla buildings range from 6 to 8-storey residential blocks to mixed commercial units, and most existing roofs are reinforced concrete 20 to 25 centimetres thick. Before executing the rooftop addition, the site engineer must inspect the slab, reinforcement mesh, columns and foundations to confirm they carry the new load, especially in older buildings. The site also requires strict procedures to remove old asphalt and waterproofing without damaging the primary roof, then pour the new slab with load-bearing beams and additional columns if needed.
Qibla is in Capital governorate, a mixed commercial and residential district near Gulf Road and Seif Palace.
Most existing roofs in Qibla are reinforced concrete 20 to 25 centimetres thick and require detailed structural inspection before addition.

What the work covers
Structural check of the existing roof through to handover of the finished rooftop floor.

Existing roof assessment
Check slab thickness, column capacity and load margin before any work starts.

Drawings and permits
Prepare structural and architectural drawings and obtain the municipality building permit.

Rebar tie-in to columns
Core-drill column tops and epoxy-anchor starter bars for the new frame.

Concrete frame and walls
Pour new columns, beams and roof slab with reinforced block infill walls.

New roof insulation
Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

Full finishing
Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.
How it works.
First contact
Call or WhatsApp us to describe the house and current floor count.
Site visit
We visit to inspect the roof slab and columns and assess their load capacity.
Drawings and permit
We prepare structural and architectural drawings and handle the building permit.
Construction
Tie rebar to existing columns, pour frame and slab, raise walls and roof.
Finishing and handover
Complete all finishes on the new floor then hand over with final drawings.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Rooftop floor addition
Other services in Qibla
Questions about Rooftop floor addition in Qibla
Call nowHow do we verify that the existing roof carries a new floor?
The engineer measures slab thickness, reinforcement and load-bearing columns, then calculates the total load of the new floor including furniture and use. If capacity is sufficient, we proceed with the addition; otherwise we strengthen columns or slab first.
Do we strip the old asphalt and waterproofing before pouring the new floor?
Yes, we carefully remove all asphalt, waterproofing and debris to reach clean concrete, then prepare the surface for pouring. This ensures good bond for the new slab, pipes and drainage.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps