Adding a rooftop floor in Khiran requires careful inspection of concrete roof with attention to the coastal environment and high humidity. We assess reinforcement and concrete condition, evaluate salt and moisture impact, then build the new floor with materials and treatments suited to local conditions.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Khiran is a coastal area featuring chalets, resorts and holiday homes, mostly built to withstand coastal conditions. Concrete roofs here suffer greater impact from salt, wind and excess humidity, causing reinforcement deterioration and cracks. Before adding any floor, we inspect reinforcement with advanced equipment, measure corrosion and concrete cracking degree, and sample for strength testing. We may need to remove deteriorated surface layers and re-treat the roof with salt-resistant materials before building the new floor.

Khiran lies in Ahmadi governorate, a coastal area featuring resorts and tourist chalets near Khiran Bay.

We apply special standards for protecting reinforcement from coastal salt and moisture when building the additional floor.

Back to Rooftop floor addition

See also: Additional floor in Khiran

What the work covers - Rooftop floor addition

What the work covers

Structural check of the existing roof through to handover of the finished rooftop floor.

  • Existing roof assessment

    Check slab thickness, column capacity and load margin before any work starts.

  • Drawings and permits

    Prepare structural and architectural drawings and obtain the municipality building permit.

  • Rebar tie-in to columns

    Core-drill column tops and epoxy-anchor starter bars for the new frame.

  • Concrete frame and walls

    Pour new columns, beams and roof slab with reinforced block infill walls.

  • New roof insulation

    Thermal and waterproof insulation on the new slab to prevent cracking and leaks.

  • Full finishing

    Gypsum, tiling, aluminium, electrical and plumbing finishing for the new floor.

How it works.

  1. First contact

    Call or WhatsApp us to describe the house and current floor count.

  2. Site visit

    We visit to inspect the roof slab and columns and assess their load capacity.

  3. Drawings and permit

    We prepare structural and architectural drawings and handle the building permit.

  4. Construction

    Tie rebar to existing columns, pour frame and slab, raise walls and roof.

  5. Finishing and handover

    Complete all finishes on the new floor then hand over with final drawings.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Rooftop floor addition in Khiran

Call now
How does coastal salt affect concrete roofs in Khiran?

Salt causes corrosion of steel reinforcement and concrete cracking. We assess deterioration carefully and may need special treatment or partial roof replacement before addition.

Do materials for the additional floor differ from other Khiran areas?

Yes. We use salt-resistant concrete and reinforcement, and apply extra protective layers to reduce coastal environment impact on the new floor.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works