
Additional floor in Rehab
Feasibility study for an additional floor in Rehab includes comprehensive assessment of the existing building and required municipal approvals. We design and execute reinforcement and pouring through to final structure handover ready for finishing.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Rehab houses sit on medium-sized family plots, most built in the last three decades with sound frames but not originally planned for additional floors. When assessing feasibility, we examine foundation depth and clearance between the existing ceiling and the municipal height limit. Most Rehab homes need only localized column reinforcement by adding new steel and pouring around columns, or limited new supporting beams. The new design must maintain the side and front setbacks as defined by the original building permit.
Rehab lies in Farwaniya governorate, an organized family residential district under the Rehab Housing Co-operative.
Most Rehab house foundations are built at depths between 1.5 and 2.5 metres and typically tolerate additional floors with prior assessment and localized reinforcement.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Rehab
Questions about Additional floor in Rehab
Call nowHow long does a complete floor addition take from assessment to handover?
Assessment and testing take 3 to 4 weeks, municipal application and approval 2 to 4 weeks, then structure and pouring takes 8 to 10 weeks depending on floor size and reinforcement complexity.
What if the soil under the foundation is weak and needs special treatment?
We conduct detailed soil-bearing capacity testing. If weak, we may deepen the foundation or add new support piers at greater depth. This is incorporated into the design before any excavation begins.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps