Additional floor in Kuwait - Dajeej

Additional floor in Dajeej

Adding a floor in Dajeej depends on inspecting desert soil and shallow foundation, and calculating expected settlement under new loads. We modify the design according to soil capacity and the existing structure's condition.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most houses and buildings in Dajeej are built on desert plots with weak sandy soil, and foundations are typically shallow, only 1 to 1.5 metres deep. Sandy soil compacts easily under heavy loads, so adding a new floor may cause uneven settlement in the existing building, especially if columns are unevenly loaded. We measure soil properties by drilling test boreholes and taking samples, then decide if the foundation needs widening or deep cement piles to transfer loads to stronger strata.

Dajeej sits in Farwaniya governorate, a desert-fringe area with scattered buildings and sandy soil.

We test sandy soil in Dajeej to measure bearing capacity and expected settlement before designing the additional-floor foundation.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Dajeej

Call now
Can sandy soil in Dajeej safely accept an additional floor?

Yes, but only after measuring soil properties first. We drill test boreholes and measure bearing capacity and settlement, then design the foundation and columns accordingly.

What is the difference between foundation widening and deep piles in Dajeej?

Foundation widening works if surface soil is strong enough. Deep piles are needed if sandy soil is weak to significant depth; we transfer loads to stronger rock layers below.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works