
Additional floor in Dajeej
Adding a floor in Dajeej depends on inspecting desert soil and shallow foundation, and calculating expected settlement under new loads. We modify the design according to soil capacity and the existing structure's condition.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most houses and buildings in Dajeej are built on desert plots with weak sandy soil, and foundations are typically shallow, only 1 to 1.5 metres deep. Sandy soil compacts easily under heavy loads, so adding a new floor may cause uneven settlement in the existing building, especially if columns are unevenly loaded. We measure soil properties by drilling test boreholes and taking samples, then decide if the foundation needs widening or deep cement piles to transfer loads to stronger strata.
Dajeej sits in Farwaniya governorate, a desert-fringe area with scattered buildings and sandy soil.
We test sandy soil in Dajeej to measure bearing capacity and expected settlement before designing the additional-floor foundation.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Dajeej
Questions about Additional floor in Dajeej
Call nowCan sandy soil in Dajeej safely accept an additional floor?
Yes, but only after measuring soil properties first. We drill test boreholes and measure bearing capacity and settlement, then design the foundation and columns accordingly.
What is the difference between foundation widening and deep piles in Dajeej?
Foundation widening works if surface soil is strong enough. Deep piles are needed if sandy soil is weak to significant depth; we transfer loads to stronger rock layers below.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps