Annex construction in Kuwait - Rehab

Annex construction in Rehab

Villa annexes in Rehab are added to fairly spacious family plots in an organized residential setting. We design the annex, obtain approvals, then build it with efficiency and rigorous quality control.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Villas in Rehab sit on plots of 600 to 1000 square metres, most built recently from the 1990s onward with modern designs. Annexes here range from full servant quarters to extra bedrooms or even small independent buildings with private courtyards. The neighbourhood is well organized with pavements and utility networks carefully planned, which eases equipment and material access and allows precise foundation and pouring work without obstacles. We focus on matching the annex to the villa's overall appearance and the area, and adhering to the municipality's approved schedules.

Rehab sits in Farwaniya governorate, an organized family residential area of scattered villas on relatively spacious plots.

The waiting period for a municipality permit for an annex in Rehab is typically 3 to 4 weeks after submitting the required drawings and documents.

Back to Annex construction

What we build for you - Annex construction

What we build for you

From a single room addition to a full two-storey annex, designed and permitted.

  • Annex design

    Architectural and structural drawings prepared for municipality permit submission.

  • Outdoor annex construction

    Ground-level reinforced concrete annex with its own independent foundation.

  • Two-storey annex

    Two-floor addition with a foundation sized for the full combined load.

  • Annex renovation

    Demolish, replan, and rebuild an existing annex to a new layout.

  • Structural tie-in

    Epoxy dowels and bonding agents tying new concrete to the existing frame.

  • Annex finishing

    Block walls, plaster, tiling, and aluminium works to match the main villa.

How it works.

  1. Call or whatsApp

    Share photos and the plot; a site visit is arranged.

  2. Site assessment

    Structural check of the existing villa and plot boundary review.

  3. Design and permit

    Drawings prepared and submitted to the municipality for approval.

  4. Construction

    Foundation, frame, tie-in work, block walls, slab, and finishing.

  5. Handover

    Snagging completed, keys and approved drawings handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Annex construction in Rehab

Call now
Can an independent servant wing with a private courtyard be built in Rehab?

Yes, and Rehab's relatively spacious plots allow for it. We design a small independent building with a separate entrance and courtyard, and ensure it meets the approved setbacks and municipality design standards.

How do you ensure the new annex matches the original villa design in Rehab?

We study the original design elements including colors, materials and architectural proportions, then design the annex with matching architectural details. We present the drawings to the villa owner and the site engineer before beginning any work.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works