Additional floor in Kuwait - Jabriya

Additional floor in Jabriya

Adding a floor to a residential villa in Jabriya requires engineering assessment of the current foundation and structure and calculation of new loads. We deliver the new storey complete with independent service systems and uniform finishing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Villas in Jabriya sit on spacious, flood-safe plots, mostly one or two storeys with reinforced concrete foundations on short columns. The soil here is harder than Rumaithiya and less prone to high humidity, making foundations more stable. When adding a floor, we assess the strength of existing columns and beams and their capacity for additional loads. Isolated villas on their own plots allow free access and scaffolding setup, which eases execution. We focus on maintaining existing services and isolating new-storey systems from them from the start.

Jabriya lies in Hawalli governorate and contains spacious detached villas near Mubarak Hospital and the American University.

Columns in Jabriya villas are typically 35 to 45 centimetres in diameter and need pressure testing before reinforcement is decided.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Jabriya

Call now
Does Jabriya soil need a different foundation when adding a floor?

Jabriya soil is stronger and more stable than coastal areas, but must be lab-tested to determine bearing capacity. In most cases, we widen the existing foundation or add support columns rather than rebuild from scratch.

What is the expected duration for adding one floor to a villa?

It depends on villa size and reinforcement needed, but typically takes seven to ten weeks from engineering assessment to full handover of the new floor.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works