Adding a floor to a villa in Rumaithiya requires studying the original foundation design and the shallow marine soil. We verify the current house stability, then execute reinforcement and the new storey as a single phase.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Rumaithiya villas sit near the seafront on medium plots, mostly one or two storeys with gardens. The soil here is shallow sand with very high groundwater, meaning original foundations may be shallow or on short piles. Adding a floor significantly raises the load, so the existing foundation must be checked and possibly deepened or widened. High humidity and salinity affect concrete over time, so we use salt and moisture-resistant concrete mixes for new sections.
Rumaithiya lies in Hawalli governorate and contains villas on spacious plots close to the seafront.
The groundwater level in Rumaithiya is usually no more than one and a half metres from ground level, which limits how deep a new foundation can go.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Rumaithiya
Questions about Additional floor in Rumaithiya
Call nowHow do we handle high groundwater when adding a floor to the villa?
We use temporary drainage during excavation and pouring, and may need to pump water or build a light retaining wall. After completion, we restore groundwater to its natural state and waterproof the new foundation.
Is ordinary concrete suitable for the new foundation near the sea?
No, we use salt-resistant concrete with higher cement content and special admixtures to prevent corrosion. We also protect reinforcement from moisture and salt, and monitor periodic maintenance.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps