Additional floor in Kuwait - Nuqra

Additional floor in Nuqra

Adding a floor in Nuqra starts with a comprehensive study of the existing building and surrounding plot. We assess the adequacy of the foundations and columns, then design and build the new frame with coordination from the municipality and site engineer.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Nuqra buildings are a mix of residential and commercial, some old apartment blocks on narrow plots near Gulf Road and others detached or semi-detached houses on medium plots. Many of these buildings are at least forty years old, meaning the foundations may be relatively shallow and the columns have small diameters. Adding a floor in such cases sometimes requires partial structural reinforcement and careful re-assessment of potential settlement. We also respect the currently approved setbacks and confirm the new floor will not exceed the plot boundary.

Nuqra lies in Hawalli governorate near Salmiya, hosting a mix of residential and commercial buildings on plots of varying sizes.

We verify the depth of existing foundations through supervised excavation before proceeding with the additional floor study.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Nuqra

Call now
Can a floor be added to an old apartment building with old foundations in Nuqra?

Yes, but it requires careful assessment of the foundation condition and potential settlement. We take concrete samples and probe the foundations to verify depth and strength, then provide recommendations based on findings.

Do the approved setbacks allow adding a floor on a narrow plot in Nuqra?

It depends on the specific plot and applicable regulations. We coordinate with the municipality to confirm the new floor maintains required setbacks and does not exceed any area height limit.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works