Additional floor in Kuwait - Qurain

Additional floor in Qurain

Additional-floor work in Qurain focuses on rural homes and villas with strong concrete foundations. We assess the existing structure's capacity to carry a new floor, then execute reinforcement, pouring and finishing as one coordinated job.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most homes in Qurain are built on relatively large plots and owners now seek expansion for family reasons, requesting a new residential floor. The existing foundations and columns are usually designed for single-floor load only, so we reinforce the columns with additional steel and concrete to the height of the new floor, and clearly separate the new service runs (water, drainage, electricity) from the lower networks. We also load-test the first floor before pouring to ensure the structure does not settle during the work.

Qurain is located in Mubarak Al-Kabeer governorate, a residential area with villas and rural homes spread across large plots.

We test the foundation soil and the capacity of the existing columns before designing the new floor.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Qurain

Call now
Will the old foundations support the weight of an additional floor?

Only a full engineering inspection can confirm this. We reinforce the first-floor columns with new steel and additional concrete, and redistribute the load evenly across the foundations through strengthened columns.

How long does adding a complete floor take from start to handover?

It depends on villa size and reinforcement complexity, but inspection, strengthening, pouring and finishing typically span two to three months from start date.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works