Additional floor in Kuwait - Sabhan Industrial

Additional floor in Sabhan Industrial

Adding floors to warehouses and industrial workshops in Sabhan requires precise inspection of heavy foundations and frames. We assess current load capacity and execute reinforcement, pouring and handover as an approved, safe coordinated job.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Warehouses and workshops in Sabhan are usually built with old metal or concrete frames designed for storage only, with deep, column-free floor areas. Adding a new floor means redistributing the new load across sometimes shallow or widely dispersed foundations. We strengthen perimeter and internal columns with steel bands and reinforced concrete, and obtain approvals from the municipality and Civil Defence because workshops may house hazardous materials or heavy equipment.

Sabhan Industrial sits in Mubarak Al-Kabeer governorate, an industrial district with warehouses, workshops and heavy equipment spread across large plots.

We complete frame and soil inspection and obtain existing engineering drawings before any reinforcement or pouring work.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Sabhan Industrial

Call now
Can a floor be added to an old metal-frame warehouse?

Yes, but it requires precise engineering assessment of foundation and column strength. We may need to reinforce columns with new concrete and steel or add internal support columns.

Does staying operational on the first floor during new-floor construction cause problems?

Vibrations from pouring, reinforcement and machinery may occur. We develop a protection plan for stored equipment and materials, and isolate work zones with barriers and safe scaffolding to ensure safety.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works