Additional floor in Kuwait - Sabah Al-Salem

Additional floor in Sabah Al-Salem

Additional-floor service in Sabah Al-Salem targets modern villas with known concrete frame designs. We review original building documents and assess foundations before approving the new-floor project.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most villas in Sabah Al-Salem were built in recent decades to uniform standards for frames and foundations, making assessment straightforward. The soil here is deep, loose sand, and foundations typically extend one and a half metres or deeper. When planning a new floor, we verify the original building permits and drawing files to understand column types and sections, then request updated calculations from the consulting engineer that account for the added loads on the frame and soil.

Sabah Al-Salem is in Mubarak Al-Kabeer governorate, a district of modern residential villas near the popular Messila Park area.

We require original building drawings and completion certificates before calculating additional-floor feasibility.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Sabah Al-Salem

Call now
Are modern villas in Sabah Al-Salem designed to accommodate an additional floor?

Not always. Original designs may be for one or two storeys only. We inspect columns, beams and soil to determine if additional floors are structurally feasible with new engineering calculations.

What if the original building drawings are lost?

We conduct a detailed site survey and take precise measurements of column and beam dimensions and floor heights. Based on this data, the consulting engineer calculates load capacity and feasibility.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works