
Additional floor in Dasma
Additional floor work in Dasma balances the capabilities of villas and residential apartments with proximity to the city centre and services. We assess the structure and design reinforcements based on the building's actual technical condition.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Dasma mixes older villas on medium plots with residential apartments from the 1960s and 70s with simple concrete foundations. Many buildings have not received regular structural maintenance and columns and beams may show cracks from ground movement. Before adding a floor, we need a full inspection of existing cracks, reinforcement and concrete quality, and may need to inject cracks or strengthen columns with welded steel plates. The downtown location also means restrictions on working hours and noise, so we coordinate with the municipality.
Dasma sits in the Capital governorate near the city centre and services, a mix of villas and residential apartment buildings.
Dasma apartment buildings are often three to four storeys with simple concrete columns that need thorough inspection before adding a floor.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Dasma
Questions about Additional floor in Dasma
Call nowCan old columns be reinforced instead of building new ones?
Yes, and it is less disruptive. We weld steel plates to the sides of existing columns and inject chemical grout into any cracks, increasing load capacity without demolition.
Do fine cracks in walls and columns affect the decision to add a floor?
It depends on the crack type and direction. Cracks from slow ground movement may be stable, but we monitor them with measuring gauges for two weeks before final approval.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps