
Additional floor in Shamiya
Shamiya is a mixed residential area with villas and shops on plots of varying sizes, and adding a floor requires review of the original permit and new municipal approval. We assess the existing frame and ensure compliance with current building code.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Shamiya villas vary widely in age and design, some over 30 years old and some newer, with plots ranging from 400 to 1200 square meters. Foundations and structural frames differ significantly by build year and contractor, requiring case-by-case study. When adding a floor, we assess the foundation, columns and beams, and verify they meet current safety standards and can handle the extra load.
Shamiya is in the Capital governorate near the Fifth Ring Road junction, a mixed-use residential and commercial district.
Shamiya villas built before 1995 are usually designed for a maximum of three storeys, so adding a fourth floor may require foundation reinforcement.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Shamiya
Questions about Additional floor in Shamiya
Call nowCan you add a floor to an old villa without reinforcing the foundation?
It depends on foundation condition, soil type and the new floor load. Some old villas have strong foundations that tolerate addition, but most need at least localized reinforcement under main columns.
Do modifications to an old villa require new design drawings from an architect?
Yes, the municipality requires new architectural and structural drawings showing the added floor and modifications to the existing frame. We prepare and submit these for municipal approval before construction starts.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps