Annex construction in Kuwait - Dasma

Annex construction in Dasma

Building safe annexes on older Dasma villas requires inspection of existing foundations and confirming their capacity for new loads. We connect the new annex to the villa through columns and beams that transfer load evenly to the soil.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Dasma villas were built decades ago on medium-sized plots, and many have simple foundations requiring engineering inspection before adding an annex. A single or two-storey annex connects to the villa via beams that distribute load evenly, and we must avoid direct loading of the old foundation without stability assessment. We also respect the plot's approved setbacks and distance from side boundaries, and we separate the annex utilities from the original networks.

Dasma sits in the Capital governorate, a relatively older residential villa neighbourhood near the city centre.

Inspection of the old villa's foundation in Dasma precedes any annex design to ensure it can carry additional loads.

Back to Annex construction

What we build for you - Annex construction

What we build for you

From a single room addition to a full two-storey annex, designed and permitted.

  • Annex design

    Architectural and structural drawings prepared for municipality permit submission.

  • Outdoor annex construction

    Ground-level reinforced concrete annex with its own independent foundation.

  • Two-storey annex

    Two-floor addition with a foundation sized for the full combined load.

  • Annex renovation

    Demolish, replan, and rebuild an existing annex to a new layout.

  • Structural tie-in

    Epoxy dowels and bonding agents tying new concrete to the existing frame.

  • Annex finishing

    Block walls, plaster, tiling, and aluminium works to match the main villa.

How it works.

  1. Call or whatsApp

    Share photos and the plot; a site visit is arranged.

  2. Site assessment

    Structural check of the existing villa and plot boundary review.

  3. Design and permit

    Drawings prepared and submitted to the municipality for approval.

  4. Construction

    Foundation, frame, tie-in work, block walls, slab, and finishing.

  5. Handover

    Snagging completed, keys and approved drawings handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Annex construction in Dasma

Call now
Can an annex be added to an old villa without strengthening its original foundation?

No, we conduct an engineering inspection to assess the old foundation's strength first. If needed, we use separate foundations for the annex or reinforce the existing foundation before pouring.

Does the annex need a separation joint from the original villa?

Yes, we leave a dilation joint between the annex foundation and the original villa to prevent cracks from differential soil movement and building settlement. This preserves the integrity of both structures.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works