Wall soundproofing in Kuwait - Sharq

Wall soundproofing in Sharq

Apartments in Sharq near the towers and main roads need wall soundproofing against traffic and neighbour noise. We assess the existing wall thickness and cavity between units, then install multi-layer sound barriers to a paint-ready finish.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Sharq buildings are mid-rise residential towers with closely packed apartments sharing partition walls on both sides, and many units face Gulf Street or congested secondary roads. The 20 cm concrete walls between apartments need sound-barrier layers if noise is high, and open-plan layouts with large windows increase sound paths. We assess each unit separately to identify which walls need treatment, and we preserve ventilation cavities and service runs during installation.

Sharq sits in Capital governorate, a district of tall residential towers near Kuwait Towers and the main Gulf Road.

Most partition walls between Sharq apartments are reinforced concrete around 20 cm thick before any soundproofing treatment.

Back to Wall soundproofing

See also: Sound insulation in Sharq

What the work covers - Wall soundproofing

What the work covers

Site assessment through multi-layer installation to a finished, paint-ready surface

  • Sound path survey

    Identify which walls transmit noise and assess their construction

  • Resilient channel framing

    Metal profiles that decouple the new lining from the existing wall

  • Mineral wool infill

    Cavity packed with acoustic-grade mineral wool at the correct density

  • Dual-layer gypsum board

    Two staggered layers that break the vibration path through the board

  • Penetration sealing

    Seal cable outlets, pipes and service holes with acoustic compound

  • Finished surface

    Joints taped and surface levelled ready for paint or any finish

How it works.

  1. First contact

    Call or WhatsApp us; describe which walls and what noise bothers you

  2. Site visit

    We measure walls, trace sound paths and map service penetrations

  3. Quote and spec

    Detailed quote covering materials, layer count and final lining thickness

  4. Installation

    Framing, wool infill, board layers and penetration sealing in correct sequence

  5. Check and handover

    Joints and weak points checked; surface handed over paint-ready

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wall soundproofing in Sharq

Call now
How many sound-barrier layers does a concrete partition wall between two apartments need?

It depends on the current noise level and available wall depth. We typically add a sound barrier board over the concrete, an air gap, a sound-absorbing layer, and finally drywall ready for paint.

Can we soundproof just one wall in the apartment and leave the others untreated?

Yes, but noise may still leak through other walls or windows. We first assess the main sound paths and recommend prioritization based on the noise source.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works