Waterproof coating in Kuwait - Nasseem

Waterproof coating in Nasseem

Liquid waterproof coating on Nasseem roofs protects houses and apartment buildings from water infiltration and climate damage. Substrate cleaning, crack repair, and multi-coat application ensure lasting concrete protection.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Nasseem is a residential neighbourhood in Jahra with diverse houses and apartment blocks whose exposed concrete roofs face the elements. Roofs here endure high temperatures and long dry periods followed by sudden seasonal moisture. Fresh concrete may develop shrinkage cracks from rapid drying. Before coating, we clean the surface with brushes and low-pressure washing to remove dust, salts and efflorescence, then fill all hairline cracks with epoxy filler. The liquid membrane is applied in three successive coats with full dry intervals between each.

Nasseem is located in Jahra governorate, a residential area subject to significant climate swings.

We measure concrete moisture with a moisture metre before applying any waterproof coat to ensure it will accept the coating.

Back to Waterproof coating

See also: Roof waterproofing in Nasseem

What the work covers - Waterproof coating

What the work covers

Substrate cleaning, crack repair and multi-coat application of liquid waterproof coating.

  • Surface inspection

    Locating cracks, open pores and any spalling before work starts.

  • Cleaning and decontamination

    Removing dust, oils and old loose layers for proper coating adhesion.

  • Crack filling

    Sealing hairline and wider cracks with flexible repair mortar before coating.

  • Primer coat

    A penetrating primer that anchors the waterproof coating into the concrete substrate.

  • Waterproof coating coats

    Applying at least 2 cross-direction coats for uniform thickness and full coverage.

  • Corners and drain sealing

    Reinforcing vulnerable junctions at corners, drain collars and window sills.

How it works.

  1. Contact us

    Call or WhatsApp us and send photos of the affected surface.

  2. Site assessment

    We visit to measure the area and assess concrete and existing coating condition.

  3. Surface preparation

    Cleaning, crack repair and applying the bonding primer coat.

  4. Coating application

    Applying waterproof coating coats with reinforced corners and drain details.

  5. Handover check

    Checking coverage, coat thickness and full cure before handing over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Waterproof coating in Nasseem

Call now
Why do cracks and spalling appear in newly poured concrete roofs?

Cracks result from concrete shrinkage during rapid drying, especially under high heat and strong winds. Spalling allows water to penetrate the concrete and weaken the structure over time.

Can waterproof coating be applied directly to new concrete without repairing cracks first?

No, cracks must be filled first. Water seeps through cracks and undermines the waterproof layer from within, causing protection to fail.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works