Waterproof coating in Kuwait - Naeem

Waterproof coating in Naeem

Liquid waterproof coating in Naeem protects villa and apartment roofs from water leakage and cracking. We clean the surface of dust and defects, then apply successive layers for reliable, lasting seal.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Naeem buildings range from single villas to small apartment blocks, mostly with flat roofs and drainage pipes that can clog with sand and dust. The area experiences harsh dry seasons followed by sudden winter rains, causing concrete cracking from expansion and contraction. Before applying waterproof coating, we deep-clean the surface and remove sand and dust from drains and openings, inspect every fine crack and repair it. Then we apply the sealant in overlapping layers for comprehensive protection.

Naeem is located in Jahra governorate, a residential district of villas and small apartment blocks with flat roofs exposed to thermal expansion and contraction.

Drainage channels in Naeem are often clogged with sand and dust and require cleaning before sealing.

Back to Waterproof coating

See also: Roof waterproofing in Naeem

What the work covers - Waterproof coating

What the work covers

Substrate cleaning, crack repair and multi-coat application of liquid waterproof coating.

  • Surface inspection

    Locating cracks, open pores and any spalling before work starts.

  • Cleaning and decontamination

    Removing dust, oils and old loose layers for proper coating adhesion.

  • Crack filling

    Sealing hairline and wider cracks with flexible repair mortar before coating.

  • Primer coat

    A penetrating primer that anchors the waterproof coating into the concrete substrate.

  • Waterproof coating coats

    Applying at least 2 cross-direction coats for uniform thickness and full coverage.

  • Corners and drain sealing

    Reinforcing vulnerable junctions at corners, drain collars and window sills.

How it works.

  1. Contact us

    Call or WhatsApp us and send photos of the affected surface.

  2. Site assessment

    We visit to measure the area and assess concrete and existing coating condition.

  3. Surface preparation

    Cleaning, crack repair and applying the bonding primer coat.

  4. Coating application

    Applying waterproof coating coats with reinforced corners and drain details.

  5. Handover check

    Checking coverage, coat thickness and full cure before handing over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Waterproof coating in Naeem

Call now
Do you clean drainage channels before applying the waterproof coating?

Yes, we remove sand and dust from all drains and openings and ensure water flows freely before applying any waterproof coating.

Do you repair concrete cracks from heat before sealing?

Yes, we carefully inspect the surface and fill all cracks and voids with flexible bonding compound before applying the liquid waterproof coating layers.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works