Waterproof coating in Kuwait - Faiha

Waterproof coating in Faiha

Liquid waterproof coating on Faiha rooftops protects villas and residential apartments from water infiltration and seasonal humidity. We start with thorough surface cleaning, repair cracks, and apply multi-layer liquid waterproof coating.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Faiha is a quiet residential area with villas and mid-rise apartments on relatively spacious plots. Most roofs here are flat with moderate surface areas, collecting water around AC units and metal ducting. Fine cracks appear on these building roofs due to intense summer thermal expansion and winter contraction, so we inspect them carefully before application. We use flexible cement-based materials to fill cracks to ensure they do not reopen.

Faiha sits in the Capital governorate, a residential neighbourhood overlooking Faiha Park and known for quiet streets.

Faiha residential roofs need periodic inspection for fine cracks resulting from thermal expansion and contraction.

Back to Waterproof coating

See also: Roof waterproofing in Faiha

What the work covers - Waterproof coating

What the work covers

Substrate cleaning, crack repair and multi-coat application of liquid waterproof coating.

  • Surface inspection

    Locating cracks, open pores and any spalling before work starts.

  • Cleaning and decontamination

    Removing dust, oils and old loose layers for proper coating adhesion.

  • Crack filling

    Sealing hairline and wider cracks with flexible repair mortar before coating.

  • Primer coat

    A penetrating primer that anchors the waterproof coating into the concrete substrate.

  • Waterproof coating coats

    Applying at least 2 cross-direction coats for uniform thickness and full coverage.

  • Corners and drain sealing

    Reinforcing vulnerable junctions at corners, drain collars and window sills.

How it works.

  1. Contact us

    Call or WhatsApp us and send photos of the affected surface.

  2. Site assessment

    We visit to measure the area and assess concrete and existing coating condition.

  3. Surface preparation

    Cleaning, crack repair and applying the bonding primer coat.

  4. Coating application

    Applying waterproof coating coats with reinforced corners and drain details.

  5. Handover check

    Checking coverage, coat thickness and full cure before handing over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Waterproof coating in Faiha

Call now
Why do cracks appear on villa and apartment roofs in Faiha?

Intense thermal expansion in summer and contraction in winter causes concrete movement. We repair cracks with flexible materials before waterproofing to prevent them from widening later.

Does liquid coating protect against AC water and leaks around pipes?

Yes, but we first clean the area around AC units and ducts thoroughly. We apply extra coating layers around these critical areas to ensure full protection.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works