Membrane roof waterproofing in Kuwait - Faiha

Membrane roof waterproofing in Faiha

Membrane roof waterproofing in Faiha protects residential villas and mid-rise apartment blocks in this quiet suburban district. We remove old coatings and patch cracks, then lay the membrane in flat overlapped sheets and seal every edge and outlet to ensure lasting protection.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Faiha homes are mostly residential villas and two to three-storey apartment blocks with medium-sized flat roofs, exposed to sun and wind but less harshly than coastal areas. Many older roofs have layered, worn coatings that need deep scraping before new installation. The quiet residential character means limited working space and need to minimize disturbance to residents during membrane laying and curing.

Faiha is in the Capital governorate, a quiet residential area near Faiha Park and its cooperative society.

We schedule roof work outside peak heat and wind times to ensure proper sealing of the membrane sheets.

Back to Membrane roof waterproofing

See also: Roof waterproofing in Faiha

What the work covers - Membrane roof waterproofing

What the work covers

Substrate preparation, membrane laying and sealing every weak point through to handover.

  • Concrete preparation

    Clean the deck, remove loose old layers and fill cracks before bonding.

  • Primer coat

    Apply bituminous primer to ensure the membrane bonds firmly to the deck.

  • Torch application

    Heat-weld each membrane roll to the deck for a full continuous bond.

  • Parapet edge sealing

    Turn the membrane up parapet walls and seal edges with flexible flashing.

  • Drain collar detail

    Bond and seal the membrane around each drain collar to stop water ingress.

  • Post-installation check

    Inspect the full membrane, laps and details before the job is signed off.

How it works.

  1. First contact

    Call or WhatsApp us and describe the roof condition and leak symptoms.

  2. Roof survey

    We visit, inspect the deck, existing layers and all penetrations.

  3. Quotation

    We send a detailed quote covering membrane type, prep works and total cost.

  4. Installation

    Deck prep, primer, torch-welding rolls and sealing every edge and collar.

  5. Check and handover

    Full inspection of the completed membrane before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Membrane roof waterproofing in Faiha

Call now
Can you waterproof an old villa roof with multiple existing coatings?

Yes, but it requires thorough scraping of all old and worn layers down to clean concrete, then we lay the new membrane on a solid base.

How long does the waterproofing membrane need to cure after installation?

The membrane needs a dry environment and protection from rain for at least 48 hours after installation, particularly if temperatures drop below 15°C.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works