
Membrane roof waterproofing in Faiha
Membrane roof waterproofing in Faiha protects residential villas and mid-rise apartment blocks in this quiet suburban district. We remove old coatings and patch cracks, then lay the membrane in flat overlapped sheets and seal every edge and outlet to ensure lasting protection.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Faiha homes are mostly residential villas and two to three-storey apartment blocks with medium-sized flat roofs, exposed to sun and wind but less harshly than coastal areas. Many older roofs have layered, worn coatings that need deep scraping before new installation. The quiet residential character means limited working space and need to minimize disturbance to residents during membrane laying and curing.
Faiha is in the Capital governorate, a quiet residential area near Faiha Park and its cooperative society.
We schedule roof work outside peak heat and wind times to ensure proper sealing of the membrane sheets.

What the work covers
Substrate preparation, membrane laying and sealing every weak point through to handover.

Concrete preparation
Clean the deck, remove loose old layers and fill cracks before bonding.

Primer coat
Apply bituminous primer to ensure the membrane bonds firmly to the deck.

Torch application
Heat-weld each membrane roll to the deck for a full continuous bond.

Parapet edge sealing
Turn the membrane up parapet walls and seal edges with flexible flashing.

Drain collar detail
Bond and seal the membrane around each drain collar to stop water ingress.

Post-installation check
Inspect the full membrane, laps and details before the job is signed off.
How it works.
First contact
Call or WhatsApp us and describe the roof condition and leak symptoms.
Roof survey
We visit, inspect the deck, existing layers and all penetrations.
Quotation
We send a detailed quote covering membrane type, prep works and total cost.
Installation
Deck prep, primer, torch-welding rolls and sealing every edge and collar.
Check and handover
Full inspection of the completed membrane before final handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Membrane roof waterproofing
Other services in Faiha
Questions about Membrane roof waterproofing in Faiha
Call nowCan you waterproof an old villa roof with multiple existing coatings?
Yes, but it requires thorough scraping of all old and worn layers down to clean concrete, then we lay the new membrane on a solid base.
How long does the waterproofing membrane need to cure after installation?
The membrane needs a dry environment and protection from rain for at least 48 hours after installation, particularly if temperatures drop below 15°C.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps